• SH&E
is a line management responsibility. Ownership and accountability for SH&E
performance is embedded in the line at all levels and Line Managers are
responsible for providing SH&E leadership and for development and
implementation of SH&E management plans for their areas of
responsibility.
The Model Procedure Suites are indexed as below:
• SH&E Management
• Safety
• Environment
• Engineering
• Health
Will discuss this further….
Process Safety
Whilst the Model
Procedures provide some guidance to the management requirements of hazardous
processes, it is recognized that they may not provide comprehensive coverage.
Process Hazard
related SHE Management Plan inputs to be
looked at separately. These inputs would be coming from the following sources:
• Basis of Safety on which the processes should be
designed and operated. Basis of Safety will be discussed separately.
• Model Procedures which must be fully implemented for
a particular technology which may be part of a plant.
• Authorization any major process changes.
• Requirements of technology specific engineering
standards which must be applied.
• Upgrades and sustenance capital requirements to
maintain integrity.
As said in the last Blog, Model Procedures are categorized under SHE Management, Safety, Health, Environment
and Engineering. As can be seen here, process part is not fully covered.
All these bullet points require further elaboration as we move
along….
No comments:
Post a Comment