Friday, 6 January 2017

 SH&E is a line management responsibility. Ownership and accountability for SH&E performance is embedded in the line at all levels and Line Managers are responsible for providing SH&E leadership and for development and implementation of SH&E management plans for their areas of responsibility. 


The Model Procedure Suites are indexed as below:
• SH&E Management
• Safety
• Environment
• Engineering
• Health


Will discuss this further….

Process Safety

Whilst the Model Procedures provide some guidance to the management requirements of hazardous processes, it is recognized that they may not provide comprehensive coverage.

Process Hazard related  SHE Management Plan inputs to be looked at separately. These inputs would be coming from the following sources:

• Basis of Safety on which the processes should be designed and operated. Basis of Safety will be discussed separately.
• Model Procedures which must be fully implemented for a particular technology which may be part of a plant.
• Authorization any major process changes.
• Requirements of technology specific engineering standards which must be applied.
• Upgrades and sustenance capital requirements to maintain integrity.  

As said in the last Blog, Model Procedures are categorized under SHE Management, Safety, Health, Environment and Engineering. As can be seen here, process part is not fully covered.


All these bullet points require further elaboration as we move along…. 

No comments:

Post a Comment